Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74314 REL 10: 1992-009-00 EXP WDFW SCR O&M, YAK, UCR, LCR
Project Number:
Title:
Yakima Phase II Fish Screens Operations and Maintenance (O&M) with Washington Department of Fish and Wildlife (WDFW)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
74314 REL 10
Contract Title:
1992-009-00 EXP WDFW SCR O&M, YAK, UCR, LCR
Contract Continuation:
Previous: Next:
72953: 1992-009-00 EXP WDFW SCR O&M, YAK, UCR, LCR
Contract Status:
Closed
Contract Description:
Task 1 - Inspection, operation, and maintenance of one fishway and 20 fish screens located on upper and mid-Columbia River tributaries.

Task 2 - Provide ongoing fishway operation and maintenance for 11  lower Columbia River fishways.

Task 3 - Cost-share with other proponents, fish screening Research and Design (lamprey screen testing with USGS), fish screen purchase or fabrication, and other allowable actions to support the recovery of anadromous salmonid species in the mid and upper Columbia River and its tributaries.
Account Type(s):
Expense
Contract Start Date:
07/01/2017
Contract End Date:
06/30/2018
Current Contract Value:
$140,000
Expenditures:
$140,000

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jamie Cleveland Bonneville Power Administration Yes COR jacleveland@bpa.gov (503) 230-3160
Daniel Didricksen Washington Department of Fish and Wildlife (WDFW) Yes Contract Manager daniel.didricksen@dfw.wa.gov (509) 571-5559
Ray Gilmour Washington Department of Fish and Wildlife (WDFW) No Interested Party ray.gilmour@dfw.wa.gov (509) 575-2743
Edward Gresh Bonneville Power Administration No Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Janice Jackson Washington Department of Fish and Wildlife (WDFW) No Technical Contact janice.jackson@dfw.wa.gov (360) 902-2444
Thomas Jameson Washington Department of Fish and Wildlife (WDFW) No Supervisor thomas.jameson@dfw.wa.gov (360) 902-2612
Rachel Kulak Bonneville Power Administration Yes Contracting Officer rakulak@bpa.gov (503) 230-5091
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Joshua Rogala Washington Department of Fish and Wildlife (WDFW) Yes Technical Contact joshua.rogala@dfw.wa.gov (509) 575-2735
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Amy Windrope Washington Department of Fish and Wildlife (WDFW) No Interested Party amy.windrope@dfw.wa.gov (360) 298-2278
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Documentation and Assistance to Support BPA's Environmental Compliance Group B: 165. Obtain ESA Compliance for O&M Activities 06/30/2018 06/30/2018
All Administrative Tasks Fulfilled with Timely Quality Products C: 119. Manage and Administer Project 06/30/2018 06/30/2018
Inspect and Maintain Upper and Mid-Columbia R Screens D: 186. Maintain Upper + Mid-Columbia Screens/Fishways (Task #1) 06/30/2018 06/30/2018
O&M Lower Columbia River Tributary Fishway E: 186. Maintain Lower Columbia River Passage (Task #2) 06/30/2018 06/30/2018
Provide Pre-Fabricated Fish Screens and Fish Screening Materials as Appropriate F: 69. Screen Placeholder #1 Provide Materials to Support Install of Fish Screen (Task #3) 06/30/2018 06/30/2018
Provide Pre-Fabricated Fish Screens and Fish Screening Materials as Appropriate G: 69. Screen Placeholder #2 Provide Materials to Support Install of Fish Screen (Task #3) 06/30/2018 06/30/2018
Provide Pre-fabricated Fish Screens and Fish Screening Materials as Appropriate H: 69. Screen Placeholder #3 Provide Materials to Support install of Fish Screen (Task #3) 06/30/2018 06/30/2018
Provide Pre-Fabricated Fish Screens and Fish Screening Materials as Appropriate I: 69. Screen Placeholder #4 Provide Materials to Support Install of Fish Screen (Task #3) 06/30/2018 06/30/2018
Provide Pre-Fabricated Fish Screens and Fish Screening Materials as Appropriate J: 69. Screen Placeholder #5 Provide Materials to Support Install of Fish Screen (Task #3) 06/30/2018 06/30/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 5 instances of WE 69 Install Fish Screen
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 07/01/2017
B 165 Obtain ESA Compliance for O&M Activities 07/01/2017
C 119 Manage and Administer Project 07/01/2017
D 186 Maintain Upper + Mid-Columbia Screens/Fishways (Task #1) 07/01/2017
E 186 Maintain Lower Columbia River Passage (Task #2) 07/01/2017
F 69 Screen Placeholder #1 Provide Materials to Support Install of Fish Screen (Task #3) 07/01/2017
G 69 Screen Placeholder #2 Provide Materials to Support Install of Fish Screen (Task #3) 07/01/2017
H 69 Screen Placeholder #3 Provide Materials to Support install of Fish Screen (Task #3) 07/01/2017
I 69 Screen Placeholder #4 Provide Materials to Support Install of Fish Screen (Task #3) 07/01/2017
J 69 Screen Placeholder #5 Provide Materials to Support Install of Fish Screen (Task #3) 07/01/2017
K 132 Support Annual Reporting 07/01/2017